Community Information Meeting · What We Shared

Ida County Data Centers

On Tuesday, August 11, we met at the Ida Grove Community Recreation Center to talk about data centers in Ida County. This page is the short version of what we presented, and what happens next.

Held
Tuesday, August 11
Ida Grove Community Recreation Center
Webinar held
Monday, August 17
7:00–8:30 PM Central
Next in-person meeting
Monday, August 24
5:30–7:30 PM, doors at 5:00 · Arthur Community Center, 224 Main Street, Arthur

How we got here

We have proposed bringing a data center to Ida County. Where it could go, how big it could be, and whether it gets built at all runs through the County’s public process, under rules the County adopts first.

Read the framework yourself

With every project, we start broad, then condense it down as we learn more, power limitations, site conditions, and local input included.

What we land on is research and a starting point, for each county's board to react to, revise, and finish however they see fit.

Here's what we have outlined for Ida County.

What we build

We build small. Think neighborhood hospital, not Mayo Clinic. We build in 10 MW blocks, and we ask every county we work in to cap project size at 25 MW in its own rules — so the limit belongs to the County, not to us.

10 MW
The block we build in
25 MW
The max size cap we ask counties to adopt
40,000 sqft
Per 10 MW block — a movie theater's footprint
< 30 acres
Site size at the largest build
< 65 dBA
Noise at the property line
$100–150M
Investment per 10 MW block

Figures are the design estimates presented at the August 11 meeting.

The water picture

The water question is really a cooling question — and we use closed-loop cooling, which recirculates the same water instead of evaporating it away.

Each 10 MW block is designed to use about 350,000–700,000 gallons per year — about what 3 to 6 households use. Even at the largest build under the 25 MW cap, that's roughly 875,000–1.7 million gallons a year, about what 8 to 15 households use — and still less than a similar-sized movie theater uses in a year (about 2,000,000 gallons).

The giant water numbers you may have read about come from evaporative-cooled hyperscale campuses — a different design at a different scale. That's not what we build, and the draft guidelines put low-water closed-loop cooling in the County's rules, not just our plans.

Not all data centers are the same

"Data center" covers buildings that have almost nothing in common. Most of what makes national news — thousand-acre campuses, hundreds of megawatts — is the hyperscale end of this table. We're the first row.

TypeLandPowerWater (annual)
PathOneUnder 30 acres10 MW blocks, up to 25 MW350K–1.7M gallons
Small / EdgeUnder 25 acresUnder 25 MW3M–17M gallons
Regional25–100 acres25–100 MW17M–69M gallons
Hyperscale100–700 acres100–500 MW69M–346M gallons
Mega hyperscale700–1,000 acres500–1,500+ MW346M–1B gallons

Six protections we're asking the County to adopt

Rules come first. These are in front of the County now — binding on us and on anyone who builds after us. The Board holds the pen.

1 · Keep it controlled

Cap project size at 25 MW. Every project requires County approval — no exceptions.

2 · Protect neighbors

Strict noise limits at nearby farms and homes, quieter building design and sound barriers, downward-shielded lighting, and screened equipment.

3 · Protect water and farmland

Require low-water closed-loop cooling. Fix or pay for any damage to nearby wells. Favor industrial ground and lower-quality farmland over productive acres.

4 · Pay your own way

The developer pays for road damage and improvements, utility infrastructure, safety equipment and firefighter training, and independent studies and inspections.

5 · Benefit the community

Pay full property taxes. Take no local tax abatement. Make additional community investments, and publicly report water use and promised benefits.

6 · Stay accountable

Ongoing public reporting and enforcement, for the life of the facility — not just at approval.

Taxes and jobs — the honest version

A facility this size pays full local property taxes — roughly 3.9% of building cost every year — and we take no local tax abatement. On jobs: a 10 MW facility is not a jobs program, and we won't pretend otherwise. At full build it supports roughly 10–20 permanent full-time positions at strong wages, plus construction work while it's built.

What happens next

The big questions get answered here. We're collecting what came up Tuesday night and what gets submitted through this page, and we'll publish written answers to the questions asked most.

The online webinar was held Monday, August 17, 7:00–8:30 PM (Central). Thanks to everyone who joined and asked questions live.

The next in-person meeting is Monday, August 24, 5:30–7:30 PM (doors at 5:00), at the Arthur Community Center, 224 Main Street, Arthur. Same format as our first meeting in Ida Grove. Details on Eventbrite.

Didn’t get to ask? Ask now.

Whether you were in the room Tuesday or couldn’t make it, send it in — we read everything, and the questions asked most get answered on this page.

Got it — thank you. We’ll answer you directly, and if it’s something others are wondering too, the answer goes up on this page.
Something went wrong sending that — please try again in a minute.

Want a seat at the table?

We’re forming a Community Advisory Council — people who live and work in the community, hear project information first, ask the hard questions, and bring their neighbors’ concerns to the table. It’s open to supporters and skeptics alike.

Learn more and raise your hand →

Accessibility

If you need an accommodation to attend, send us a note through the form above and we’ll make it work.